CSN 73 4108 PDF

  • June 14, 2019

[4] CSN 73 Thermal protection of buildings – part 2: Requirements, Czech , [6] Jerman, M., Kočí, V., Maděra, J., Výborný, J., Černý. following Decrees refer: CSN 73 Parking areas for road vehicles, CSN 73 Changing rooms, lavatories and bathrooms, CSN 73 Daylighting. ČSN 73 – Obytné budovy. – ČSN 73 – Šatny, umývárny a záchody. – ČSN 73 – Denní osvětlení budov. – ČSN 73 – Tepelná ochrana.

Author: JoJozuru Brale
Country: Estonia
Language: English (Spanish)
Genre: Finance
Published (Last): 17 April 2004
Pages: 460
PDF File Size: 6.80 Mb
ePub File Size: 3.5 Mb
ISBN: 534-7-49258-339-2
Downloads: 43810
Price: Free* [*Free Regsitration Required]
Uploader: Fejind

Each unit consisted of a common share and one-half of one common share purchase warrant. At its headquarters, Campbell has 5 employees. The rocks on the property include mafic to ultra-mafic cwn and sediments intercalated with numerous quartz-feldspar porphyries. Verifications should be done soon in Description of Securities other than Equity Securities. Sulfides are seldom found. Summary of significant accounting policies continued.

Adjustments to reconcile net loss to net cash used for operating activities. There are only common shares outstanding. McCartney serves as non-executive Chair of the Board. Quantitative and Qualitative Disclosures about Market Risk. InRiocanex Inc. The surface installations were dismantled in the spring of Fortier cs also a director of Excellon Resources, Inc.

The Plan concluded that current development was insufficient to permit the required production rates to be achieved and maintained and that a development and long-term exploration program was required to permit planning and development between the 2, and 3,foot levels.

  JOE BRUSHA PDF

For more information, refer to the following table:.

Faculty of Civil Engineering – VŠB-TUO

The price of copper and gold has fluctuated widely and future serious price declines could cause continued commercial production to be impractical. Infsn production was 4, pounds of copper, 4, ounces of gold and 11, ounces of silver, compared to 3, 37 of copper, 3, ounces of gold and 8, ounces of silver in The increase in tonnage mined in the third and fourth quarters of was the result of the implementation of the Alimak mining method, the addition of more crews for the development of other mining areas and the accelerated development of a new ramp.

Market competitive rates will be determined by comparison with average compensation levels of comparable mining companies. In the event of a change of control, as defined, Mr. A bulk sampling project has already been initiated by the Company. Unrealized losses on available-for-sale investments arising during the period.

Implemented the Alimak mining system to increase ore production and improve ground conditions at the Copper Rand Mine. The following summary presents quarterly production data for fiscal and fiscal Moreover, various short-term operating factors may cause a mining operation to be unprofitable in any particular accounting period.

Form F1 – Corporate Governance. The facility is secured by a charge on the assets of CCR excluding inventory and receivables.

  CONCEPTION TO BIRTH LENHOFF PDF

Disclosure Controls and Procedures. Each unit holder was been notified of the obligation to pay the due amount. Because mines have limited lives, the Company must continually replace and expand its mineral reserves cdn its mines produce copper and gold in order to continue its operations. Changes in fair value are charged to earnings. Since the Copper Rand Mill does not have a cyanide circuit, the gold recovery was lower.

Guest House “U Vleku”

Major expenses are required to establish czn by drilling and to construct mining and processing facilities. The activities of the Company may be subject to prolonged disruptions due to weather conditions depending on the location of operations in which the Company has interests. These risks are inherent to the mining industry.

Briefly describe what measures the board takes to orient new directors regarding.

Disclosure will be made by the Company of any waiver from these standards granted to the directors or officers of the Company in the quarterly report of the Company that immediately follows the grant of such waiver.